Technical Guide for Winter Maintenance of Electric Forklifts
I. Core System Maintenance: Battery and Power Chain
(I) Power Battery Maintenance
(II) Motor and Electronic Control System Maintenance
II. Transmission and Travel System Maintenance
(I) Hydraulic System Maintenance
(II) Travel System Maintenance
III. Safety and Auxiliary System Maintenance
(I) Brake System Maintenance
(II) Auxiliary Safety System Maintenance
IV. Daily Operation and Environmental Adaptation
(I) Startup and Preheating Procedures
(II) Parking and Environmental Protection
(III) Operational Safety Standards
V. Maintenance Cycles and Key Performance Indicators
(I) Daily Maintenance (Pre/Post-Operation)
| Stage | Maintenance Items |
|---|---|
| Pre-Operation | - Battery voltage and fluid level (lead-acid) - Tire pressure and condition - Lighting and warning devices - Brake performance - Hydraulic system leakage - Instrument functionality |
| Post-Operation | - Clean ice/dust from the forklift - Recharge the battery - Inspect for leakage/looseness - Park in designated area and turn off main power |
(II) Weekly Maintenance
(III) Monthly Maintenance
(IV) Key Performance Indicator Standards
| System | Standards |
|---|---|
| Battery | Winter available capacity ≥70% of rated capacity; charging time ≤8 hours; cell voltage difference ≤0.1V |
| Hydraulic System | Operating pressure: 15-20MPa; lifting speed ≥0.2m/s; no leakage/abnormal noise |
| Brake System | No-load braking distance ≤3m (30km/h); full-load ≤5m; no slipping on 15° slope (parking brake) |
| Motor & Control | Motor temperature rise ≤80℃; control system operating temperature ≤60℃; insulation resistance ≥1MΩ |